Decem instrumenta pro innitatur productio

I. Just-in-tempus productio (Jit)

Et iustus-in-tempus productio modum originem in Japan et eius basic idea est ad producendum requiritur uber in requiritur quantitas solum cum opus. Core huius modus productionis est studium a productio ratio sine inventory, aut productio ratio illa minimizes inventarium. In productione operatio, ut sequatur in vexillum requisitis, producendum secundum demanda, et mittere quot materiae ut opus in site ne abnormes.

II. 5s et visual Management

5s (collatione, rectification, Purgato, Purgato, literacy) est efficax instrumentum pro on-site visual procuratio, sed etiam ad instrumentum pro virgam literacy emendationem. Clavem ad victoria 5s est standardization, maxime detailed on-site signa et patet responsabilitates, ut employees potest primo ponere munditiam in site et apparatu, et paulatim professional et bonum professional literacy.

III. Kanban Management

Kanban potest esse sicut modo ad commutationem notitia de productio administratione in planta. Kanban pecto continent satis aliquantulus of notitia et potest esse saepe. Sunt duo genera Kanban vulgo usus: productio Kanban et partus Kanban. Kanban est directus, visibilis et facilis ad administrare.

IV. De mensuris operandi (Sop)

Standardization est maxime efficax procuratio tool ad altum efficientiam et altum qualitas productionem. Post valorem amnis analysis de productio processus, in texta vexillum formatur secundum ad scientificum processum fluxus et operating ratio. In vexillum non solum ex pro uber qualitas iudicio, sed etiam ex disciplina employees ad vexillum operationem. Haec signa includit on-site visual signa, apparatu administratione signa, uber productio signa et uber qualitas signa. Innitatur productio requirit quod «omnia sit standardized."

V. Plena productio sustentationem (TPM)

In via plena participatione creare bene-disposito apparatu ratio, amplio utendo rate of existentium apparatu, consequi salutem et altum qualitas, ne defecturis altiore productio efficientiam et amplio altiore efficientiam. Non solum reflectitur in 5s, sed potius, opus salutem analysis et tutum productio administratione.

6.use valorem amnis maps ut identify vastum (VSM)

Productio processus est plena prodigiosus vastum phaenomena, valorem flumine mapping est basis et clavis punctum explementing innitatur ratio et eliminating processus vastum:

COGNOSCO ubi perditio occurs in processus et identify innitatur emendationem occasiones;

• intellectus in components et momenti de valore fluminum;

• Quod facultatem actually trahere a "valorem amnis map";

• agnoscis application of notitia ad valorem amnis diagrams et prioritize notitia quantitatem melius occasiones.

VII. Libratum consilio productio linea

Invitio layout conventus linea ducit ad necessarium motus productionis operarios, ita reducendo productio efficientiam. Ob inconveniens motus dispositionem et inconveniens processus itineris, operarios exciperent vel posuit workpiece tres vel quinque. Nunc iudicium est momenti, ita sit site planning. Nisi tempus et conatus. Plus minus.

VIII. Excute productio

The so-called pull production is Kanban management as a means, the use of “take material system” that is, after the process according to the “market” needs to produce, the shortage of products in the process of the previous process to take the same amount of products in process, so as to form the whole process of pull control system, never produce more than one product. Jit necessitates ut fundatur super viverra productio, et viverra ratio operatio est typical pluma de innitatur productio. Niti studio de nulla inventory, maxime optimum viverra systema operationem ad consequi.

IX. Fast Switching (Smed)

In doctrina ex ieiunium switching fundatur in operationibus research ars et concurrentes ipsum, cum intentio ex minimising apparatu downtime sub quadrigis collaboration. Cum mutato uber linea et adjusting apparatu, plumbum tempus potest comprimi ad magnam, et effectus ieiunium switching est manifestum.

Ut ad redigendum in downtime expectationem perdere ad minimum, processus reducendo setup tempus est ad gradatim removere et redigendum omnibus non-valorem-addidit jobs et convertam eos in non-downtime completur processibus et convertam eos in non-downtime completur processibus. Productio innitatur continuously eliminare vastum, reducere inventarium, reducere defectibus, breviare ad operandum exolvuntur et alia speciale requisitis ad consequi, reducendo nos consequi hoc metam ad auxilium.

X. Mercurius (Kaizen)

Cum satus ad verius determinare valorem, identify valorem flumine, fac ad gradus creandi valorem pro certo productum fluxus continue, et in Lorem trahere valorem ex inceptis, in magica incipit fieri.

Pelagus Service:

Creform Pipe System

Karakuri Ratio

Aluminium Profile System

Welcome to quote pro projects:

Contact:info@wj-lean.com

Whatsapp / Phone / Weckat: LXXXVI CXXXV CMLXV (IV) CIII

Website:www.wj-lean.com


Post tempus: Sep, 13-2024